Pressure and Leak Checks
Verifies the pressure integrity and leak-tightness of piping, valves, equipment and connections.
Taybo designs and integrates liquid cooling systems for AI and high-density computing workloads. Built around modular cooling plants, CDUs, secondary-side distribution piping and rack interfaces, these systems bring cooling supply, heat exchange, circulation, controls, leak detection and water quality management into a coordinated design. Factory prefabrication, interface management, testing and validation help reduce deployment risks associated with leaks, contamination, material incompatibility and on-site connections. This approach provides thermal management infrastructure that can expand in phases to support IT workloads with high power densities.
We select and configure chillers, dry coolers or hybrid cooling systems to suit the site’s climate, energy efficiency targets, redundancy requirements and operating strategy, providing a stable cooling supply for the liquid cooling system.
Key inputs include total IT heat load, rack power density, coolant supply and return temperatures, design flow rate, system differential pressure, coolant type, material compatibility, and particulate cleanliness and water quality standards. Redundancy requirements, control protocols, UQD/quick-disconnect couplings, leak detection methods, maintenance clearances and drainage arrangements also need to be confirmed, along with primary-side cooling source and site piping conditions. These inputs directly influence CDU capacity, pump set selection, pipe diameters, manifold configuration, filtration ratings, control strategy and how the system is divided into modules.

Verifies the pressure integrity and leak-tightness of piping, valves, equipment and connections.
Checks system flow paths and pressure drop against design requirements.
We carry out flushing, passivation, and water quality or particulate cleanliness checks as required by the project, with protective sealing and packaging for delivery.
Checks sensors, controllers, communication interfaces, alarms and operating logic.
Verifies leak detection, alarm functions and the system interlocks agreed for the project.
Taybo provides commissioning and heat load testing for liquid-cooled data halls so cooling performance is proven before full IT load arrives. Factory and site heat load banks: Portable or skid-mounted heat load banks simulate rack and CDU thermal load at the factory or on site. Validate heat rejection, approach temperatures, and control response under staged load steps without waiting for production IT equipment. CDU loop validation: Confirm primary and secondary CDU loops for flow, differential pressure, supply/return temperatures, filtration, and control setpoints. Verify redundancy switchover, alarm limits, and leak-detection interlocks against the project sequence of operations. Thermal commissioning for liquid-cooled halls: Execute hall-level thermal commissioning across CDUs, secondary distribution, and rack interfaces. Document stable operation under design heat load, tune controls for efficiency and safety margins, and hand over clear test records for operations teams. Factory interface readiness supports this path: BIM, equipment lists, interface matrices, and numbered prefabricated pipe sections integrate CDUs, pump sets, filtration, manifolds, valves, instrumentation, and secondary piping so modules connect on arrival with clearly defined interfaces—reducing site uncertainty before heat load testing begins.

AI data centers, high-performance computing centers, data halls with high power densities, cold plate liquid cooling projects, hybrid air and liquid cooling projects, liquid cooling retrofits for existing data centers, and projects requiring phased deployment and rapid expansion of liquid cooling capacity.
Multidiscipline engineering and construction documentation
Individual service packages or a combined design scope

Documents for system design, equipment selection and construction coordination
| Service package | Typical deliverables |
|---|---|
| Design basis | Basis of Design, drawing register and main equipment BOQs |
| Electrical power | Load / cable calculations, schematics, layouts and details |
| Mechanical & cooling | Equipment / hydraulic calculations, schematics, layouts and details |
| Fire protection | Gas suppression calculations, alarm and suppression drawings |
| ELV, ICT & BMS | Network / security drawings, BMS point lists and port schedules |
| Fit-out & foundations | Plans, elevations, installation details and equipment foundation plans |
Optional: Data hall airflow CFD reportIFC = Issued for Construction. Final scope and delivery formats follow the project agreement.
Design review at each submission stage
MEP design basis and drawing register
Initial drawings, calculations and equipment BOQ
Developed drawings and updated equipment BOQ
Final drawings and updated equipment BOQ